Project Description
-
Project Type: Grid infrastructure (smart switchgears for MV lines)
-
Capacity: N/A (equipment project, not generation capacity)
-
Status: Under Initial Engagement – EA registered on the PIF (Public Investment Fund) Private Sector Hub for “Distribution Switchgears for Medium-Voltage Lines.” First meeting with KSA utility team held in August 2025.
-
Timeline:
-
2025 – EA presents profile and credentials
-
2026 – potential pilot installations
-
2027–2028 – full rollout if selected as partner
-
-
Technical Details: Supply of NASA-inspired, robust switchgear and control systems to improve grid reliability. Includes resilient transformers, smart reclosers, and SCADA integration designed for extreme desert environments.
-
Partners:
-
PIF (sovereign fund, coordinating local involvement)
-
Saudi Electric Company (SEC – end user)
-
Regional lead: Ismail Albager, EA VP in Riyadh
-
-
Description: Supports Saudi Arabia’s Vision 2030 by modernizing distribution infrastructure. EA’s advanced switchgear reduces losses, minimizes outages, and enables greater renewable integration. U.S.-engineered technology emphasizes resilience and cyber-secure operations.
-
Verification: EA’s role confirmed by registration on the PIF platform and correspondence with PIF’s Private Sector Engagement team. Initial verification through meeting invitation and company profile submission; further proof expected via pilot contracts or MoU with SEC.



